This survey aims to engage the affected communities in decisions about the design of the viaduct refurbishments as part of the Stage 3 Design Consultation for the project. The design proposals being considered at this stage to be influenced by the results of this survey are:
- tie-ins to existing and future paths
- selecting a bridge option from a shortlist of three to progress to detailed design (Stage 4).
The survey will open at 00:00 on 16 September 2021 and close at 00:00 on 8 October 2021.
","tags":["Carmyle","NCN","NCN new routes","storymap","Westburn"],"snippet":"Community engagement survey as part of the Stage 3 Design Consultation for the Carmyle-Westburn Viaduct Project","thumbnail":"thumbnail/Image02.png","documentation":null,"extent":[],"categories":[],"spatialReference":null,"accessInformation":null,"licenseInfo":"
The survey results contain special category data that is not to be accessed by anyone other than the project team. Please speak to the project manager Claire Frost (
claire.frost@sustrans.org.uk) if you require access to survey data.
","culture":"en-gb","properties":null,"advancedSettings":null,"url":null,"proxyFilter":null,"access":"public","size":3236400,"subInfo":0,"appCategories":[],"industries":[],"languages":[],"largeThumbnail":null,"banner":null,"screenshots":[],"listed":false,"commentsEnabled":true,"numComments":0,"numRatings":0,"avgRating":0,"numViews":25,"scoreCompleteness":100,"groupDesignations":null,"apiToken1ExpirationDate":-1,"apiToken2ExpirationDate":-1,"lastViewed":1728594000000},"appId":"f972f2590e4d46be94bafdac5713f54e","portalUrl":"https://www.arcgis.com","ssr":{}}